You are browsing the archive for north dakota state water commission.

Corps invites public input on proposed Tolna Coulee structure operating plan

January 13, 2012 in Grand Forks Herald

The U.S. Army Corps of Engineers is seeking public input on its proposed operating plan for the Tolna Coulee Advance Measures control structure being built in Nelson County, N.D. The document will be used by the project’s non-federal sponsor, the North Dakota State Water Commission, to operate the structure. Continue Reading

No funding for Killdeer water line

December 9, 2011 in The Dickinson Press

The time to let the water flow through Killdeer is not right, officials said Friday at the Best Western Ramkota Hotel in Bismarck.
Continue Reading

DEVILS LAKE FLOODING: Third outlet on the table

June 22, 2011 in Grand Forks Herald

Officials hope to begin moving water yet this yearDevils Lake water could be moving through a gravity-flow outlet from Stump Lake through the Tolna Coulee to the Sheyenne River yet this year, providing Devils Lake Basin residents with what many believe is the best chance of relief from the record 18-year-old flood. Continue Reading

Avatar of INFORUM

by INFORUM

$4.2M approved for Devils Lake projects

October 27, 2010 in INFORUM

Money to be spent on designs for bigger outlets for flooded lake

The North Dakota State Water Commission has approved spending $4.2 million for engineering to design new and bigger outlets from Devils Lake that could bring more relief to the chronically flooded lake within a year. Continue Reading