Work continuing on St. Croix Crossing project

August 22, 2012 at 6:03 am in New Richmond News

Work continues on the load test project for the proposed new bridge between Houlton and Stillwater, Minn. The tests will determine rock and soil conditions at the bottom of the St. Croix River.
Continue Reading