Flood-control study expected to last 3 1/2 years

November 17, 2011 at 1:04 am in The Jamestown Sun

Any permanent flood risk control measures for the James River are a minimum of 3 years away as a study of possible projects continues.
The U.S. Army Corps of Engineers met with the members of the James River Joint Water Board as part of the planning for the study Wednesday in Jamestown.
Continue Reading