Pipestem spillway drained for inspection

October 7, 2010 at 2:05 am in The Jamestown Sun

If the level of the Pipestem Reservoir looks a little low these days you’re right. The lake level has been drawn about a foot below the normal fall level to allow for cleaning on the main spillway structure on the dam’s backside, according to Bob Martin, dam manager.
Continue Reading